Composting plant built by Eggersmann

Eggersmann Anlagenbau built a new composting plant in Monnerich/Luxembourg for the client syndicate Minett-Kompost. The official inauguration took place on 1 July 2022 in the presence of Luxembourg‘s Minister of the Environment Joëlle Welfring.

Eggersmann Anlagenbau replaced an aging composting plant of the „Wendelin“ type with state-of-the-art technology. Due to the hall geometry of the old plant, the longest Eggersmann rotting tunnels to date, 42 m in length, were built here. A total of 8 rotting tunnels with tunnel filling unit as well as the associated conveying and exhaust air technology were included in the scope of supply. In addition, a FORUS shredder, a TERRA SELECT trommel screen and a star screen deck, also from Eggersmann, are used in the new plant – all are operated purely electrically.

The plant processes a large part of Luxembourg‘s organic and green waste. The throughput amounts to 20 000 t/a.

www.f-e.de

www.f-e.de

x

Related articles:

Issue 2022-02 Versatile

Full-Liner Eggersmann again exhibitor at Kassel Waste Forum

At the 33rd Kassel Waste Forum (April 05-07, 2022), Eggersmann will again present itself in a correspondingly versatile manner. The company sees itself as a project company that sells its customers...

more
Issue 2021-04 Optimised composting process

Sutco-Wendelin delivers economically and ecologically

The optimised composting process is performed in a single composting area made up of several windrows which merge together without clear boundaries. This ensures optimal utilization of the overall...

more

Synergies leveraged: Eggersmann constructs disposal centre in Poland

The scope of the contract included both engineering, implementation planning, procurement, production and supply of machinery and conveying/ handling systems, and installation, start-up, trial...

more

Insolvent Nortorf based plant manufacturer Farmatic sold to Eggersmann Group

The insolvency administrator, for the plant manufacturer Farmatic GmbH, has sold the company to the Eggersmann Group, from Marienfeld near Gütersloh, on 1 February 2018. All of the remaining 23 jobs...

more
Issue 2019-02 Treatment of MSW

Innovative drying system to Iraq with the worlds’ largest turner

The Faruk Group is currently constructing a mechanical-biological waste treatment plant at Suleymaniyah for the production of alternative fuel (RDF) from 1040 t/d of MSW and commercial waste. The RDF...

more